The Climbing System Increases

The Climbing System Increases

The climbing system increases is one of the most important solutions for the world of vertical building construction since it is the one that allows the formwork panels to be assembled and disassembled, with the great advantage of not needing to rest on the ground. And why does not needing to lean on the ground mean higher productivity for a construction site? Before going into the subject, let us remember that the first climbing systems involved using a platform structure that did not have a direct connection with the formwork; that is, to raise it, it was necessary to raise and lower the panels and materials in each climbs.

This traditional process required more crane times and man-hours to assemble and disassemble the set of panels joined together. Currently, thanks to the industrialization of the construction sector, today we can count on climbing systems where the framing and the scaffolding form a set that integrates a security system with platforms and bodyguards, allowing the safe movement of shipowners. The climbing scaffold receives and supports the weight of the aluminum panels, which are placed with guide bases and a scissor tensioner, which guarantee that the forms are ready according to the desired architectural design to proceed with the concrete filling. This system optimizes many processes, allowing the builder to save money and setbacks, increasing productivity on site.

1) Reduction in Labor

Thanks to the simple technique and the reduced number of components of this platform, it is sufficient to have technical personnel on-site to ensure correct installation, in addition to the operating personnel in charge of the installation. In the same way, although special training is carried out for the use of the system, it is not necessary for the profile of the workers to be specialized or have technical knowledge, because as the work progresses, they will see how practical and fast the system is with simple actions how to loosen the paneling from the wall and anchor the system to the previously assembled panels.

2) Equipment Reuse

Because the panels are made of steel, they do not suffer considerable damage during use in construction. This means that it can be reused many times and saves on materials and maintenance.

3) Greater Safety At Heights

One of the most common accidents in the construction world is the fall of personnel from heights. For this reason, having a climbing system can save setbacks and labor inconveniences, thanks to the integration of bodyguards and catwalks that facilitate the movement of workers at great heights.

4) Better Quality In The Finishes Of The Walls

Some of these systems are so optimized that they avoid the realization of many patches. This is thanks to the fact that they use less quantity of ties, allowing to give a better final finish. Undoubtedly, the climbing system brings with it many advantages when building, and although at present, it is not the most popular system in Colombia, it has increasingly been incorporated into construction processes, facilitating and increasing the efficiency and safety of work at heights.

Read More

Choosing The Most Suitable Formwork System For Your Work

Choosing The Most Suitable Formwork System For Your Work

From the conception of the idea, through the design of the plans to assemble the structures, the use of construction techniques based on formwork systems poses important changes in the dynamics of execution of massive civil works. To know the advantages that the construction system represents through formwork, it is necessary to know what they consist of.

What Is Formwork?

Formwork is a system of temporary or permanent molds used to shape fresh concrete or similar materials; these serve as a framework for lifting concrete structures, preventing their parts from experiencing deformations until the optimal setting is achieved.

The formwork systems are easy to use, versatile, and allow optimization of construction times. In addition, the position and technique used in the installation process on-site and the materials with which they are manufactured allow the formwork to be cataloged or classified.

Types Of Formwork By Position

Horizontal formwork

They are structures used to shape slabs or beams. Its installation requires auxiliary elements such as falsework or struts arranged vertically to support loads of the materials.

Vertical formwork:

Vertical formworks are structures used for the construction of walls, columns, and pillars. Like the previous ones, these molds also need auxiliary elements.

By Construction System

Modular formwork

They are prefabricated and reusable pieces. They can be made of metal or plastic. Its installation consists of external parts supported by fittings, screws, or clips that speed up the assembly and disassembly processes. They are recommended for large works.

Traditional formwork

They are preferably made of wood. Its versatility in creating structures characterizes it. Although they can be used in large-scale works, they are recommended, mainly for medium or small works, because their implementation takes more time than modular ones.

Lost formwork

As the name that has given represents, in this case, it is not intended to recover the forms that are used for the molding of concrete, which is why the most used materials for their manufacture are plastic, cardboard, or ceramics. . Another important feature of this formwork system is that the material is permanently attached to the structure.

Sliding formwork

This system of molds is recommended for works in which the thickness and height of the structures are variable. For its installation, a hydraulic lifting system is necessary to move the parts with the greatest precision. One of the main advantages of sliding formwork is that the assembly, casting, and molding can be done simultaneously.

Aluminum Formwork

Formwork system recommended for the rapid construction of walls, columns, beams, and platforms. They are made up of reusable aluminum modules. In this segment, you can find hand-held molds, easy to operate and install.

There are also molds known as Climbing Systems. Their installation is done by using cranes to move and locate them in the different sections of the building under construction.

Advantages Of Formwork

One of the most significant advantages of using suitable formwork system for your work is that they require a short construction period that can range from an average of one house per day – in the case of aluminum formwork to four days with a normal construction formwork. This pace of installation greatly reduces the total cost of construction.

A clear example of this efficiency is aluminum formwork, simple structures that can be installed, in some cases, without any supportive mechanical equipment. For the extraction of the mold, only a set of levers and a basic technique are necessary.

Read More

5 Keys To Reduce Costs In A Construction Site

5 Keys To Reduce Costs In A Construction Site

With the use of nuts & bolt, it is possible to reduce costs on a construction site without compromising the quality of a project. Leading a construction team covers many aspects, such as having technical knowledge, supervising the work, and ethical and professional responsibility with the work team.

Undoubtedly, construction is one of the great engines of the economy and job creation. This is why a builder must constantly search for alternatives that allow him to achieve greater effectiveness and results. This last point is perhaps one of the variables that generate more 

pressure on construction project leaders since their permanent objective should be to achieve greater profitability in their construction work.

Bearing in mind that profitability is directly related to reducing costs, below, we will talk about five keys to identify where it is possible to achieve savings in a construction site.

1: Build Faster

If you build it faster, you can generate income in less time. To build faster, the builder will need to look for industrialized building systems that are faster and more cost-effective. 

The formwork construction system through forms will allow a modular construction through monolithic pours (walls and floors simultaneously)

2: Build With A Modular System

To build faster, it is ideal that the construction system adapts to all types of design, in any geometric shape or construction height. Furthermore, the more agile this process is carried out, the less wear and tear will have on the work team, and significant savings will be generated over time.

Having a complete formwork construction system that integrates the perimeter security solution will allow for faster assembly. This system must comply with all the standard requirements, which guarantee the safety of the workers, since accidents and unforeseen events of the personnel are a great emotional and professional wear and tear, causing reprocessing and cost overruns.

It is recommended to look for systems with handles integrated into the formwork panels. This will facilitate the assembly and disassembly of the equipment, which generates greater operator safety and productivity on site.

3: Reduce The Use Of Ties

The use of ties to join the walls together is one of the characteristics of construction systems where savings can be achieved. Therefore, the builder must look for a system that requires fewer ties, as this will reduce costs and time in repairs and consumables.

Furthermore, looking for a system that allows the plaster paste to be applied directly to the surface without removing it will save on finishing costs.

4: Build With A Lighter Construction System

Carrying out the assembly and removal of a construction system is one of the steps determining costs in the amount of personnel required. Using a simpler and other accessories and lighter system will avoid the use of cranes and will require fewer men to lift the different panels. In addition, with few accessories, it is easier to use and does not require expensive training.

An example given by the Forsa brand is that if the weight of each panel is 20 kg / m2, the amount of personnel required on-site to achieve the optimal performance per day would be much less than what is required with a traditional system. 

With a smaller team and the construction and industrialized system, between 1,500 and 2,000 housing units can be produced, depending on the use and care.

5 Reduce The Use Of Concrete And Accessories

Another recommendation is to build with a monolithic formwork system that allows the builder to save on concrete. These systems make it possible to reduce waste, leaving it between 0% and 2%. This system, in addition to allowing you to save time in assembly and has a special design to avoid loss of other accessories at the installation time.