NAME | BAR(mm) | LENGTH(mm) | HEX(mm) | WEIGHT(kg/pc) |
---|---|---|---|---|
CLIMBING CONE 15 X 152 | 35 | 152 | 40 | 0.910 |
CLIMBING CONE 15 X 145 | 35 | 145 | 40 | 0.830 |
CLIMBING CONE 15.0/td> | 35 | 165 | 40 | 0.780 |
CLIMBING CONE 15.0/5cm | 35 | 135 | 40 | 0.950 |
CLIMBING CONE 15 X 126 | 55 | 126 | 49 | 2.140 |
CLIMBING CONE 20 X 126 | 55 | 126 | 49 | 2.030 |
SHAFT PLAT FORM CONE | 40 | 147 | 55 | 1.190 |
Climbing Cone
Since neither Thread bars nor concrete can absorb special shear forces/lateral forces that can for example occur when using climbing formwork, these forces must have deviated via Climbing Cones. Climbing Cones are used to replace Positioning Cones after formwork stripping. Alternatively, positioning cones can be used in combination with metrical screws matching in terms of length and grade.
There are no reviews yet.